Flagship work · Data engineering migration

Two legacy data platforms. One cloud data platform.

A global programme that consolidated legacy platforms (Cloudera, Oracle ODR, BODS) into Snowflake, achieving US$3.2M annual cost savings through licensing reductions and infrastructure optimization.

  • Delivery lead, data engineering
  • Hands-on data engineering and ingestion
  • Led a team of 15+
  • Legacy decommission
  • No go-live date missed
  • 2 → 1legacy platforms consolidated into one
  • US$3.2Mannual cost savings, from licensing and infrastructure
  • 1,572dbt models in the conformed layer
  • 280 TBof legacy data purged

01The story, in plain words

From many legacy systems to one clear picture.

Three steps, whatever the data was before. Each small square is one piece of data.

01INGEST02REFINE03DELIVERSAPDatabasesFile transfersPlant historianRAW STORECloud raw storeCleanseBusiness rulesStandardiseCheckedValidateBefore: rawAfter: refined+12Everyone sees the same numbersLegacy systemsOFF
  1. Ingest

    Data is copied from many different systems, SAP and non-SAP, into one safe cloud store, just as it is.

    Raw ingestion
  2. Refine

    It is cleansed, standardised and shaped with the business’s own rules, so everyone reads it the same way. It is released through CI/CD pipelines and checked with a validation tool before go-live.

    dbt · CI/CD
  3. Deliver

    Reports and use-cases read the refined data, so people see the same numbers. Then the legacy systems are switched off.

    Reports and use-cases
  1. Ingest

    Data is copied from many different systems, SAP and non-SAP, into one safe cloud store, just as it is.

    Raw ingestion
  2. Refine

    It is cleansed, standardised and shaped with the business’s own rules, so everyone reads it the same way. It is released through CI/CD pipelines and checked with a validation tool before go-live.

    dbt · CI/CD
  3. Deliver

    Reports and use-cases read the refined data, so people see the same numbers. Then the legacy systems are switched off.

    Reports and use-cases

02Under the hood

Consolidate, then retire.

Data flows left to right into one Snowflake platform, and what it replaced is switched off underneath. Click any layer to read it in detail.

Before

After · One Snowflake enterprise data platform

Click a layer to read it in detail

Extract and land

A historical load, then incremental loads, into cloud storage and the Snowflake raw layer.

6 core ingestion patterns
Transform and validate

dbt models released through CI/CD, then validated with a migration and validation tool.

CI/CD · dbt
Repoint and cut over

Consumers identified first, then repointed to Snowflake in sprint releases.

No sprint go-live missed

Phase 1 · FY21–FY22Hadoop-based data platform

Phase 2 · FY23–FY24Oracle-based data platform

Then retireDecommission notices go out, and the legacy is switched off on its date.Notices first

Switched off280 TBof data purged126cloud instances, 74 of them legacy platform nodes
Retired108legacy integrations retired (BODS, GoldenGate, IIB)
Retired680databases decommissioned20K+tables decommissioned
Retired15,605reports decommissioned (65%)1,078user accounts retired

The runway

Two phases, delivered back to back. Each switched on its saving the year after it landed.

Saving from licensing reductions and infrastructure optimization.

  1. What it set out to do
  2. One platform

    Establish a modernised, cloud-based, single unified enterprise data platform.

  3. Self-service and speed

    Improve sustainability and self-service, accelerate delivery, and enable the data strategy by unlocking the advantages of the cloud.

  4. Consolidate

    Consolidate the legacy enterprise platforms into one Snowflake platform.

03Step by step

Every business subject area followed the same six steps.

Area by area, the people who used it were moved onto Snowflake, and the legacy was switched off for them.

  1. 01PlanPlanningPick the subject area, and identify the people and reports that use it, before anything is touched.
  2. 02IngestStreamSetsCopy that area’s data across with StreamSets pipelines, using six core ingestion patterns.
  3. 03Transformdbt · CI/CDRebuild its models in dbt, released through CI/CD: an automated build and release process.
  4. 04ValidateValidation toolCheck the results with a data migration and validation tool: zero major defects since go-live.
  5. 05Go liveSprintsMove that area’s users onto Snowflake in sprint releases. No sprint go-live date missed.
  6. 06DecommissionNoticesTell the users, then switch the legacy off for them. The final decommission landed on its date.

04Behind the delivery

The hard parts, the people and the lessons.

Open any of the three for the full account.

My part

Delivery lead for data engineering, and hands-on in the engineering.

15+people led through migration planning, transition and legacy decommission

  1. 01Plan
  2. 02Ingest
  3. 03Transform
  4. 04Validate
  5. 05Go live
  6. 06Decommission

Plan to Decommission

Led the delivery

Delivery lead for the data engineering team, from migration planning through transition to the final decommission.

  • 18migration and decommission workstreams, across three delivery groups
  • 150+teams to collaborate with

Plan

Consumers first

Identified the downstream business consumers before each transition.

  • ~1,400report users across 15+ user groups

Ingest to Transform

Built hands-on

Worked technically in data engineering and ingestion: StreamSets pipelines, and dbt transformation delivered through CI/CD.

  • StreamSets
  • dbt
  • CI/CD
  • 350+pipelines
  • 1,572dbt models
  • 6core ingestion patterns established

Validate

Zero major defects

Across everything migrated, SAP and non-SAP: none since go-live, using a data migration and validation tool.

  • 1,511raw source tables, 700+ of them SAP
  • 393conformed datasets migrated

Go live to Decommission

Kept the dates

No sprint go-live date missed, and the final decommission delivered on its date.

  • 1,441direct users in 30+ teams, engaged and decommissioned from Oracle
  • 1 monthearly on the SAP ingestion, ahead of a SAP change freeze
  • 280 TBof legacy data purged