A single date for a piece of work suggests a certainty that nobody has. A range, with the assumptions behind it, is more honest and, in practice, easier to plan around.
01 · The trouble with a date
A point estimate hides the uncertainty it came from.
When asked how long something will take, most people picture how it goes if little goes wrong. That is a best case, and it is rarely what happens, because work is subject to surprises that are individually unlikely but collectively almost certain.
The distribution of real durations is lopsided. Work can finish a little early, but it can finish much later. A single number taken from the optimistic side is therefore usually too low.
02 · Say a range
Give a low, a likely and a high, and say what each assumes.
The width of the range is information. A narrow range says the work is well understood. A wide one says there is something unknown, and invites the question of what it is.
- LowIt goes as well as it reasonably can: no rework, answers arrive quickly.
- LikelyThe normal course, with the usual small delays.
- HighReal problems occur, but not a disaster. The point at which you would be surprised to exceed it.
03 · Write the assumptions
The assumptions are the real estimate.
An estimate is only as good as the conditions it assumes: that a decision is made by a certain date, that a dependency delivers, that the team is not pulled onto other work. Listing them turns a guess into something that can be checked.
When an assumption breaks, the conversation is then about the assumption, not about whether the estimator was wrong. That keeps the discussion calm and specific.
If an estimate has no assumptions written beside it, it is a hope.
04 · Using it
Plan on the high end, commit on the likely end, and update.
For anything that depends on the work, such as a launch or a handover, plan against the high end. For the team's own commitment, the likely end is fairer, with the range visible.
Re-estimate as the work proceeds. The range should narrow as the unknowns are resolved. If it does not, that is a signal worth raising early, while there is still time to act on it.
05 · Worked example
Turning three numbers into a plan.
A task is estimated at 3 weeks if all goes well, 5 weeks in the normal course and 10 weeks if real problems appear. A common way to combine them is the three-point formula: (low + 4 × likely + high) ÷ 6, which gives (3 + 20 + 10) ÷ 6 = 5.5 weeks.
The more useful number is the spread. The gap between 5 and 10 says something is uncertain, so the next step is to find out what, perhaps a dependency or an unclear requirement, and reduce it, instead of arguing about the date.
06 · Pitfalls
Common estimating mistakes.
- Padding in secretAdding hidden slack makes the estimate unreadable. Show the range and the reasons.
- Anchoring on a date someone saidEstimate the work first, then compare it with the date. Starting from the date bends the estimate towards it.
- Leaving out the tailTesting, review, fixes, deployment and handover are part of the work, and they are the part most often forgotten.
- Counting only your own timeWaiting for answers, approvals and other people is often most of the elapsed time.
- Never checking afterwardsCompare estimates with what happened. After a few projects you will know which way you tend to be wrong.
What I took away
- Replace a single date with a low, a likely and a high.
- Write down the assumptions; they are what can change.
- Plan on the high end and narrow the range as the unknowns close.